Production log Production Index
02 Format

Promotional Video Production: How the Media Buy Decides What Gets Cut

A promotional video is not a film that gets re-exported. It is a set of related pieces built to specific lengths for specific placements, and the placement plan is the document that determines what all of them are.

That inverts the order most briefs arrive in. The conversation usually opens with a creative idea and ends with a question about formats. The productive order is the reverse: establish where this will run, in what durations and ratios, and then design something that can exist in all of them.

Placement Decides the Structure

Different placements carry different amounts of story, and the difference is not a matter of trimming.

A very short placement can hold one idea and a brand. A fifteen-second piece can hold a proposition. Thirty seconds accommodates a small structure — situation, turn, resolution. A minute or more, in a placement where the viewer has chosen to watch, can hold something closer to a narrative.

A thirty-second film cut down to six seconds is almost never good, because it was structured around a shape that the shorter version cannot contain. The versions that work are conceived together, sharing material but not sharing structure.

The practical consequence at the shoot is coverage. The shortest version’s single essential shot has to exist and has to be strong enough to stand alone, and that is a shot to plan deliberately rather than to find in the rushes.

Versioning Is Where the Budget Goes

The output of a promo project is frequently dozens of files: each duration, in each aspect ratio, with and without captions, in each language, with each end-frame or call to action, meeting each platform’s specification.

Every one of those is a separate edit — retimed, reframed, with graphics repositioned — not a copy. That is why post-production on this format regularly exceeds the shoot in both time and cost, and why an incomplete deliverable list at briefing stage is the most common source of budget disagreement.

The list should be explicit and countable before the shoot: durations, ratios, languages, caption variants, end-frames, and the destinations each is for. Platforms publish their own media specifications, and those are the reference.

Frame for the Crops You Will Actually Use

The visible failure mode of this format is a horizontal master crudely cropped to vertical, producing compositions with heads at the edge of frame and text outside the safe area.

The fix is at the shoot: frame for every ratio in the plan simultaneously, with an agreed safe area for each, and check it on the monitor rather than assuming. Where the vertical version is the primary placement, shoot for vertical and derive the horizontal, not the other way round.

Sound Off, and the First Seconds

Two viewing realities shape modern promotional work.

A substantial share of feed viewing happens with sound off, which means the piece must be legible from picture and text alone. Captions and on-screen text become design elements planned into the shots rather than laid over them afterwards, and a message that only exists in dialogue is a message a lot of the audience never receives.

And in skippable and feed placements the opening moments determine whether anything else is seen. That is a production requirement: the strongest available image has to be at the front, which sometimes means shooting a shot whose only purpose is to open the film.

Clearances Are Scoped to the Plan

Everything licensed in a promo is licensed for defined media, territories and a defined term, and the scope comes from the placement plan.

Music is the usual case: a track licensed for one market and one year is not licensed for a campaign that extends or expands. Performer usage works the same way and is negotiated separately from the shoot day. Third-party footage and images carry their own terms. And any claim made in the film has to be substantiable under the advertising standards of the markets it runs in.

The practical discipline is to scope every clearance to the maximum plausible campaign rather than the minimum planned one, because extending afterwards is negotiated from a weak position.

Approvals

Promotional work typically carries the longest approval chain of any commercial format: a client marketing team, sometimes an agency, sometimes legal or compliance review, and occasionally a broadcaster or platform clearance process.

Two things keep that manageable. A single named approver on the client side, decided before the edit begins, so that contradictory notes are reconciled by the client rather than by the editor. And a review structure that front-loads the decisions — treatment, then edit, then versions — because reopening a structural question after forty versions have been produced means producing forty versions again.

What Sets the Cost

The deliverable count first, because versioning is the largest single driver and it is countable in advance. Then shoot days and crew size. Then locations, cast and whether performers carry usage terms. Then post-production complexity — grading, sound, graphics and any visual effects. Then music licensing, scoped to the media plan. Then the number of revision rounds, and at which stage they sit.

This page states no prices. The checkable references are the published media specifications of the destination platforms and the advertising standards of the markets involved. What is comparable across quotes is the full deliverable list, shoot days, crew, cast and usage, post scope, music licence and revision rounds. A quote naming those can be read against another; a single figure cannot.

Questions this page answers

Why does the media plan come before the creative?

Because it determines the shape of the thing being made. A six-second placement, a fifteen-second pre-roll, a thirty-second spot and a sixty-second social piece are not the same film trimmed — they carry different amounts of story, and the material has to be shot with all of them in mind.

What is versioning and why is it the main cost?

Producing every duration, aspect ratio, language, caption variant and end-frame the placement plan requires. A single shoot can generate dozens of finished files, and each one is a separate edit and export rather than a copy, which is why post-production on a promo is frequently larger than the shoot.

Does the opening really matter that much?

For skippable and feed placements it is decisive, because the viewer decides within the first moments whether to continue. That has a production consequence rather than only an editorial one: the shot that must carry the opening has to exist, and it is worth shooting specifically.

Should a promo be shot for vertical or horizontal?

For whichever the placement plan actually uses, and if it uses both, framed for both from the start with a safe area agreed for each. Cropping a horizontal master to vertical after the fact produces compositions nobody designed, and is the most common visible flaw in this format.

How do sound-off placements change the shoot?

Considerably. Where a substantial share of viewing happens with sound off, the piece has to work from picture and text alone, which means captions and on-screen text are part of the design rather than an addition, and dialogue cannot be the only carrier of the message.

What has to be cleared before a promo runs?

Music licensing for the specific media, territories and term; performer usage on the same basis; any third-party footage or images; and substantiation for any claim made. Each is scoped to the placement plan, so extending a campaign later means extending each of them.